If the tank and the meters disagree, one of them is wrong. The twin tells you which.
Every barrel that comes in should either still be in the tank or have gone out through a meter. The level, the temperature, the water bottom and the roof all change how many barrels the tank really holds. The twin does that sum every day and says which reading has started to drift.
100,000 bbl external floating roof, 120 ft diameter, radar level, average temperature
Built and run to API 650, API MPMS Chapter 3, API MPMS Chapter 11.1, API MPMS Chapter 12.1
- Capacity
- 100,522 bbl
- One inch of level
- 168 bbl
- VCF at 95 °F
- 0.9834
- Roof adjustment
- 1,025 bbl
Anatomy and nameplate
- 1Primary level. Radar on a still pipe. Read against the strapping table.
- 2Secondary level. An independent gauge. The two should agree.
- 3Average temperature. Several points up the tank, averaged over the liquid.
- 4Water bottom. Free water is taken out before the oil is counted.
- 5Roof position. The roof displaces crude while it floats. A tilt points to a stuck seal or a pontoon leak.
- 6Inlet meter. Barrels received from the field.
- 7Outlet meter. Barrels delivered to the pipeline.
| Tank | |
|---|---|
| Type | External floating roof, welded steel, pontoon roof |
| Size | 120 ft diameter, 7 courses of 8 ft |
| Capacity at safe fill | 100,522 bbl at 50 ft |
| Barrels per inch | 167.4 in the bottom course, 167.7 at the top |
| Roof | 300,000 lb, lands on its legs at 6 ft |
| Instruments | Radar level on a still pipe, second level gauge, multi-point average temperature, water interface |
| Crude | |
| Gravity | 35° API, relative density 0.8498 at 60 °F |
| Density at 60 °F | 849.0 kg/m³ |
| Expansion coefficient α₆₀ | 4.732 × 10⁻⁴ per °F |
| Sediment and water | 0.3% |
| Worked gauge, 46 ft at 95 °F | |
| Total observed volume | 92,471 bbl |
| Free water | 997 bbl at 0.5 ft |
| Shell correction CTSh | 1.00040 |
| Floating roof adjustment | −1,025 bbl |
| Gross observed volume | 90,486 bbl |
| Volume correction factor | 0.98336 |
| Net standard volume | 88,713 bbl at 60 °F |
From the well to market
Wells lift the fluid. The separator splits it. Oil goes to the tank battery and gas to the compressor station, and both leave by pipeline for processing.
- Well fluid
- Crude oil
- Gas
- Has its own twin page
The physics
The equations behind every curve on this page.
Gross volume
GOV = (TOV − FW)·CTSh − FRA
Strapping table at the gauged level, less water, corrected for shell temperature and the roof.
Volume correction
VCF = exp[−α₆₀·ΔT·(1 + 0.8·α₆₀·ΔT)]
Brings warm crude back to 60 °F. α₆₀ = 341.0957 / ρ₆₀² for crude.
Net standard volume
NSV = GOV·VCF·(1 − S&W)
The barrels that get counted.
Daily balance
receipts − deliveries − ΔInventory
Should wander around zero. A trend means a reading is wrong.
Balance and gauges
The balance shows that something is wrong. The pattern shows which reading it is.
Daily balance, with a receipts meter drifting
40,000 bbl/d through the tank, net standard barrels
- Receipts − deliveries − ΔInventory
- Running total (right axis)
- Drift at full
- 0.25%, 100 bbl/d
- Gap over 60 days
- 2,449 bbl
A healthy balance wanders around zero. A meter that drifts adds a gap that grows with the barrels it measures. A leak takes barrels whether oil is moving or not. A gauge that drifts moves the inventory, not the flows.
imbalance = receipts − deliveries − ΔNSV
Primary against secondary level gauge
Radar against a second independent gauge on the same tank
- Gauge difference
- In barrels (right axis)
- One inch at this level
- 168 bbl
- A quarter inch
- 42 bbl
Two gauges that read the same level should agree. When one walks away from the other, the balance starts to drift with it. A quarter inch on a tank this wide is a truckload of crude.
ΔV = (π/4)·D²·Δh
Temperature
Crude grows as it warms. The same oil counts as fewer barrels once it is brought back to 60 °F.
Temperature effect on volume
35° API crude, 90,486 bbl gross observed
- VCF
- Net barrels at 60 °F (right axis)
- α₆₀
- 4.732 × 10⁻⁴ per °F
- 2 °F error, this tank
- 86 bbl
Warm crude takes more room. The same oil is fewer barrels at 60 °F than it looks in the tank, so the average temperature element matters as much as the level.
VCF = exp[−α₆₀·ΔT·(1 + 0.8·α₆₀·ΔT)] α₆₀ = 341.0957 / ρ₆₀²
Failure modes
What breaks, what it looks like, what the twin does about it.
| Failure mode | The physics | Signals that show it | How the twin catches it |
|---|---|---|---|
| Level gauge drift | A radar loses its reference or a float tape slips, so the level reads off by a fixed or growing amount. | Primary and secondary gauges split. Balance shifts when the tank is still. | Compares both gauges every reading and the balance on days with no flow. |
| Meter drift | Wear or a changed fluid moves the meter factor away from its last proving. | Balance gap that grows with the barrels through that meter. | Splits the gap by receipts and deliveries to say which meter it follows. |
| Leak | Oil leaves through the floor, a valve or a drain without passing a meter. | Negative balance whether or not oil is moving. Level falls while the tank is shut in. | Holds the level against the model while the tank is idle and flags any loss above gauge noise. |
| Roof tilt or seal issues | A stuck seal or a pontoon taking on liquid tilts the roof. | Roof position sensors disagree. Level jumps as the roof frees itself. | Watches roof readings against level and flags a roof that is not floating level. |
| Water build-up | Water settles out of the crude and collects at the bottom. | Interface level rising. Net volume falls while gross volume stays. | Tracks free water against draws and tells you when the bottom needs draining. |
What the twin does not do
- The twin flags a balance gap. Custody transfer stays with certified meters and your measurement team.
- We are not your overfill protection. High-level alarms and shutdowns stay independent. TwinEdge is never in the safety loop.
- We do not change meter factors or tank tickets.
How we catch it early
A physics twin and a PINN, working on one crude storage tank.
The twin is a set of equations for this machine, tuned to its nameplate. Give it the flow, speed and conditions and it returns what every reading should be. It always gives the same answer for the same inputs.
A physics-informed neural network, or PINN, sits on top. It is trained on the plant’s own data and it is penalized whenever it breaks a physics rule. So it can only learn what the equations leave out: wear, fouling, friction. It cannot invent an answer that the machine could never produce.
Step 1
Measure
Flow, pressure, current, temperature, vibration. Whatever the asset already has.
Step 2
Physics twin
The equations of this machine, set to its nameplate. It says what the readings should be right now.
Step 3
Residual
Measured minus expected. Demand, weather and speed are already taken out.
Step 4
PINN
A small neural network that learns the cause of the gap, under the physics rules.
Step 5
Finding
A named cause, a date, and the kWh or hours at stake. An engineer reviews it.
loss = (measured − predicted)² + λ · (physics residual)²
The second term is the rulebook. It is zero when the network obeys the equations.
Why this beats black-box AI
A black-box model learns patterns from history. It needs examples of each failure, and it goes quiet when the pump runs at a point it has not seen. The twin starts from physics, so it works on day one. The PINN adds what physics cannot know about this particular machine.
That is also what makes the savings countable. The baseline is a calculation, not a guess, so the gap between baseline and meter is a number a customer can check.
What the twin checks on this asset
- Daily balance in net standard barrels
- Primary against secondary level
- Gap split by receipts, deliveries and idle time
- Water bottom and roof position against level
| Fixed alarm | Black-box AI | Twin + PINN | |
|---|---|---|---|
| Needs failure history to learn | No | Yes, lots | No |
| Says what is wrong | No | Rarely | Yes, by name |
| Works at a flow it has never seen | No | Often fails | Yes, the equations still hold |
| Puts a number on the saving | No | No | Yes, in kWh and dollars |
| Lead time on slow wear | Late | Varies | Weeks to months |
| Every number can be traced | Yes | No | Yes, to an equation |
What the twin puts a number on
Energy and cost, from the equations.
One inch of level
168 bbl
A quarter inch is 42 bbl
Temperature 2 °F off
86 bbl
$6,053 at $70 per bbl, on one full tank
Meter reading 0.25% high
100 bbl/d
$7,000 a day of barrels nobody has
Found by the twin
Day 35
5 days after the meter starts to drift
What we do for you
We watch it. We catch it. We prove it.
Our reliability engineers run the twin on your crude storage tank, review every finding, and help your crew fix it. After the repair we compare the meter to the baseline and write the result in the ledger.
More assets
More from oil & gas, then the lead asset of each other industry.
- Oil & gasReciprocating gas compressorOpen
- Oil & gasBeam pumping unitOpen
- Oil & gasElectric submersible pumpOpen
- Oil & gasShell-and-tube heat exchangerOpen
- Water & wastewaterCentrifugal pumpOpen
- ManufacturingRotary screw air compressorOpen
- Buildings & data centersWater-cooled centrifugal chillerOpen
- Energy & utilitiesPower transformerOpen
- Telecom towersDiesel generator setOpen
- PharmaceuticalWFI distribution loopOpen