Telecom towers

Diesel generator set

A generator that runs light burns more fuel for every kWh, and wears faster too.

Tower loads are small, so most site generators (the DG set, in tower terms) spend their life at a quarter of their rating or less. Fuel per kWh climbs as load drops, and the engine never gets hot enough to burn clean. The twin puts a price on each hour run light and shows what battery-hybrid cycling would save.

20 kVA / 16 kW prime, 400 V 3-phase, 50 Hz, 1,500 rpm

Built and run to ISO 8528-1 (prime and standby ratings)

Sketch of a 20 kVA diesel generator set on a skid in side view: radiator and fan, four-cylinder engine with exhaust silencer, flywheel housing, alternator with terminal box and output cables, controller, start battery and belly fuel tank with level sender, with numbered sensor points.12345678radiator4-cylinder dieselalternator, 20 kVAcontrollerstart batterybelly fuel tankto transfer switch
Fuel per kWh at 25%
0.54 L/kWh
Fuel per kWh at 75%
0.34 L/kWh
Hybrid cycling, fuel
35% less
Hybrid cycling, run hours
67% fewer

Anatomy and nameplate

Sketch of a 20 kVA diesel generator set on a skid in side view: radiator and fan, four-cylinder engine with exhaust silencer, flywheel housing, alternator with terminal box and output cables, controller, start battery and belly fuel tank with level sender, with numbered sensor points.12345678radiator4-cylinder dieselalternator, 20 kVAcontrollerstart batterybelly fuel tankto transfer switch
  1. 1Voltage and current per phase. Real power from the phases, not the controller’s rounded kW.
  2. 2Engine speed. 1,500 rpm on a 4-pole alternator is 50 Hz. Drift means the governor is working hard.
  3. 3Coolant temperature. Checked against what the load and outside air should give.
  4. 4Oil pressure. Read against speed and temperature. A reading with the engine stopped is a sender fault.
  5. 5Start battery voltage. 12 V. The dip while cranking shows a weak battery before a failed start.
  6. 6Run hours and start count. Service is due on hours, not on the calendar.
  7. 7Fuel level. From the tank sender, set against the burn the load explains.
  8. 8Controller alarms and mode. Auto, manual or off. A set left in manual will not start in an outage.
Diesel generator set nameplate
Rating
Prime rating20 kVA / 16 kW at 0.8 power factor
Standby rating22 kVA / 17.6 kW
Output400 V, 3-phase, 50 Hz
Current at prime28.9 A per phase
Speed1,500 rpm, 4-pole alternator
Engine and fuel
Engine4-cylinder diesel, water cooled
Starting12 V electric start
Fuel at full prime load5.0 L/h (0.314 L/kWh)
Fuel at 75% load4.06 L/h (0.339 L/kWh)
Fuel at 25% load2.14 L/h (0.536 L/kWh)
Fuel at no load1.18 L/h
Service interval500 run hours
Reference site
Run hours a year1,081 h over 320 outages
Average load3.3 kW (20% of prime)
Fuel a year2,125 L

Telecom site power chain

The grid or the generator feeds the site through the transfer switch. The rectifier makes −48 V DC for the radios and keeps the battery charged. The air conditioner keeps the battery cool.

  • Air
  • AC power
  • −48 V DC
  • Diesel
  • Has its own twin page

The physics

The equations behind every curve on this page.

Power

P = √3 · V · I · PF

Real power from the three phases, not the controller’s rounded kW.

Load factor

LF = P / P_prime

Measured against the 16 kW prime rating, not the standby rating.

Fuel (Willans line)

F = a · P_prime + b · P

Burn has a fixed part that does not drop with load: 1.18 L/h at no load.

Fuel per kWh

F / P = a / LF + b

At 25% load it is 1.7 times the full-load figure.

Frequency

f = poles · rpm / 120

4 poles at 1,500 rpm gives 50 Hz.

Hybrid cycling

r = P_L / (P_L + P_charge · η_rt)

Share of the day the engine runs when it charges the battery and then stops.

Fuel per kWh

Every engine burns some fuel just to turn over. At low load that fixed part is spread over few kWh. Tower sites run their generators light almost all the time.

Litres per kWh against load

20 kVA / 16 kW prime generator

Litres per kWh against loadWet stacking zone0.200.300.400.500.600.700.800.901.00102030405060708090100110This site: 20%, 0.60 L/kWh0.34 L/kWh at 75%Load (% of prime rating)Fuel per kWh (L/kWh)
  • Fuel per kWh, Willans line
Full load
5.0 L/h
No load
1.18 L/h
25% against full load
1.71×

An engine burns a fixed amount just to turn over. At a quarter load that fixed part is spread over few kWh, so every kWh costs far more fuel.

F = a·P_prime + b·P F/P = a/LF + b

Run hours by load band, one year

1,081 run hours at the reference site

Run hours by load band, one year02004006008000102030405060708090100Wet stacking below 30%Load (% of prime rating)Run hours
  • Hours in each 10% band
Hours under 30% load
1,081 h (100%)
Average load
20% of prime

Tower loads are small. Every hour this generator ran was under 30% of its rating, where fuel per kWh is high and the engine runs cool.

LF = P / P_prime, P = √3·V·I·PF

Battery-hybrid cycling

Instead of running light all day, run the engine near its best load to carry the site and charge the battery, then stop it and let the battery carry the site.

One day: running continuously against battery-hybrid cycling

4 kW site, lithium string cycled 20–90%

One day: running continuously against battery-hybrid cycling0246810121416010203040506005101520Hour of dayGenerator output (kW)Fuel used so far (L)
  • Output, continuous
  • Output, cycled
  • Fuel, continuous (right axis)
  • Fuel, cycled (right axis)
Run hours a day
24 h → 7.9 h
Litres a day
51 L → 33 L
Starts a day
4.3

Run the engine hard to charge the battery, then stop it. The same day takes 35% less fuel and 67% fewer run hours.

r = P_L / (P_L + P_charge · η_rt) fuel = r · F(0.8·P_prime) against F(P_site)

What cycling saves, by site load

Generator at 80% load while it runs

What cycling saves, by site load0204060801002468101235% at 4 kWSite load (kW)Saving against running continuously (%)
  • Run hours saved
  • Fuel saved, lithium
  • Fuel saved, VRLA

The lighter the site, the more cycling saves. A battery that loses less energy on the round trip keeps more of the saving.

η_rt = 93% lithium, 82% VRLA

Failure modes

What breaks, what it looks like, what the twin does about it.

Failure modeThe physicsSignals that show itHow the twin catches it
Wet stackingBelow about 30% load the cylinders run cool. Unburned fuel and soot build up in the exhaust.Hours below 30% load. Low coolant temperature while loaded. Oily residue at the exhaust.Counts hours by load band and flags the sites that need a load-bank run or hybrid cycling.
Failed startA weak start battery, fuel starvation or a latched fault stops the engine from starting.Start battery dip while cranking. Start attempts with no run. Long crank times.Tracks every start, and flags failed or slow starts and a falling start battery.
OverheatingA fouled radiator, a failed fan belt or low coolant leaves heat in the engine.Coolant temperature above the model for the load and outside air.Compares coolant temperature with the expected value at that load and ambient.
Low oil pressureWear, low oil or a faulty sender.Oil pressure against speed and temperature.Flags readings that are impossible with the engine stopped (a sender fault) apart from real low pressure.
Service overdueOil and filters age with run hours.Run hours since the last service.Drafts the service work order at 500 run hours, not on the calendar.

What the twin does not do

  • The twin does not start or stop the engine.
  • Remote start only through your own controller and policy, with a person approving.

How we catch it early

A physics twin and a PINN, working on one diesel generator set.

The twin is a set of equations for this machine, tuned to its nameplate. Give it the flow, speed and conditions and it returns what every reading should be. It always gives the same answer for the same inputs.

A physics-informed neural network, or PINN, sits on top. It is trained on the plant’s own data and it is penalized whenever it breaks a physics rule. So it can only learn what the equations leave out: wear, fouling, friction. It cannot invent an answer that the machine could never produce.

  1. Step 1

    Measure

    Flow, pressure, current, temperature, vibration. Whatever the asset already has.

  2. Step 2

    Physics twin

    The equations of this machine, set to its nameplate. It says what the readings should be right now.

  3. Step 3

    Residual

    Measured minus expected. Demand, weather and speed are already taken out.

  4. Step 4

    PINN

    A small neural network that learns the cause of the gap, under the physics rules.

  5. Step 5

    Finding

    A named cause, a date, and the kWh or hours at stake. An engineer reviews it.

loss = (measured − predicted)² + λ · (physics residual)²

The second term is the rulebook. It is zero when the network obeys the equations.

Why this beats black-box AI

A black-box model learns patterns from history. It needs examples of each failure, and it goes quiet when the pump runs at a point it has not seen. The twin starts from physics, so it works on day one. The PINN adds what physics cannot know about this particular machine.

That is also what makes the savings countable. The baseline is a calculation, not a guess, so the gap between baseline and meter is a number a customer can check.

What the twin checks on this asset

  • Litres per kWh against the Willans line: 0.60 L/kWh at this site’s 20% load
  • Hours below 30% load: 1,081 of 1,081 run hours
  • Coolant temperature against load and outside air
  • Start success and start-battery dip on every start
  • Oil pressure plausibility, running and stopped
Fixed alarmBlack-box AITwin + PINN
Needs failure history to learnNoYes, lotsNo
Says what is wrongNoRarelyYes, by name
Works at a flow it has never seenNoOften failsYes, the equations still hold
Puts a number on the savingNoNoYes, in kWh and dollars
Lead time on slow wearLateVariesWeeks to months
Every number can be tracedYesNoYes, to an equation

What the twin puts a number on

Energy and cost, from the equations.

Fuel per kWh, 25% against 75% load

0.54 against 0.34 L/kWh

1.58 times the fuel for each kWh at a quarter load

Hybrid cycling, 4 kW site

35% less fuel

51 L a day down to 33 L. 6,557 L a year where the generator carries the site all year.

Run hours saved

67% fewer

24 run hours a day down to 7.9, with 4.3 starts a day

Cost of running light

$1,119 a year

932 L more than the same kWh at 75% load, at $1.20 per litre