Rectifier system
Every module you leave running at light load is heat you pay for twice.
The rectifier turns AC into the −48 V DC the radios run on and keeps the batteries charged. Modules are most efficient near half load, but most sites run all of them at a fraction of that. Their losses also turn into heat the air conditioner has to remove.
−48 V DC plant, 6 × 3 kW modules (N+1), float 54.0 V, boost 56.4 V
Built and run to ETSI EN 300 132-2 (−48 V DC interface)
- Peak efficiency
- 96.0% at 50% load
- All 6 on at 2.4 kW
- 93.4%
- Efficiency mode saves
- 57 W per site
- Across 1,000 sites
- 501 MWh a year
Anatomy and nameplate
- 1DC bus voltage. Float, boost, and the dip when the mains fails.
- 2Load current. What the radios draw: 44 A at the reference site.
- 3Current per module. Each module should carry the same share.
- 4AC input voltage and current. AC in against DC out gives the real efficiency.
- 5Module temperature and fan status. A failed fan makes the module derate.
- 6Battery charge current. Recharge after an outage, and the float current after that.
- 7Low-voltage disconnect state. Drops the load at 43.2 V to save the battery.
- 8Controller alarms. Read over SNMP, with traps for module and mains faults.
| Plant | |
|---|---|
| Output | −48 V DC nominal |
| Modules | 6 × 3 kW, hot-swappable |
| Capacity | 18 kW (15 kW with one module spare) |
| Module current | 55.6 A at 54.0 V |
| Float / boost | 54.0 V / 56.4 V (2.25 / 2.35 V per cell) |
| Temperature compensation | −3 mV per cell per °C |
| Low-voltage disconnect | 43.2 V (1.80 V per cell) |
| Controller | SNMP polling and traps |
| Efficiency | |
| Peak module efficiency | 96.0% at 50% load |
| At full module load | 95.4% |
| At 2.4 kW, all 6 on | 93.4%, 170 W of losses |
| At 2.4 kW, efficiency mode | 2 on, 95.5%, 113 W of losses |
Telecom site power chain
The grid or the generator feeds the site through the transfer switch. The rectifier makes −48 V DC for the radios and keeps the battery charged. The air conditioner keeps the battery cool.
- Air
- AC power
- −48 V DC
- Diesel
- Has its own twin page
The physics
The equations behind every curve on this page.
DC power
P_dc = V · I
2.4 kW at 54.0 V is 44 A.
AC input
P_ac = P_dc / η(load per module)
Efficiency depends on how hard each module works, and peaks near half load.
Losses as heat
Q = P_ac − P_dc
Every watt lost is a watt the shelter cooling has to remove.
Float with temperature
V_float = 24 · (2.25 − 0.003 · (T − 25))
A warm battery needs a lower float voltage.
Redundancy
N_needed = ceil(P_dc / P_module) + 1
2 modules carry 2.4 kW with one spare.
Efficiency mode
A module wastes a fixed few watts just being on. Spread a small load over six modules and each one sits low on its curve. Park the ones you do not need and the rest work where they are best.
Module efficiency against load per module
2.4 kW site load on a 6 × 3 kW plant
- Module efficiency
- Losses, all on
- 170 W
- Losses, efficiency mode
- 113 W
- Saved
- 57 W
Six modules sharing 2.4 kW each run at 13% load, low on the curve. Switch 4 of them to standby and the rest run near their best.
η = P / (P + p0 + k1·P + k2·P²)
Sharing and float
The modules share the load, and the controller sets the float voltage for the battery. Both drift, and both cost battery life when they do.
Current per module over two days
Six modules on the same bus
- Modules 1, 3, 4 and 6
- Module 2, carrying more
- Module 5, fails at hour 30
- Module 2 share
- +18% (limit ±10%)
- Modules needed for N+1
- 2 of 5 working
Each module should carry the same share. One that carries more runs hotter and ages first. When a module fails, the others pick up its share and the twin checks the spare is still there.
I_module = I_load / N_on N_needed = ceil(P_dc / P_module) + 1
Float voltage against battery temperature
24-cell VRLA string, −3 mV per cell per °C
- Compensated set point
- Actual, compensation off
- Overcharge at 35 °C
- 0.72 V (30 mV per cell)
A warm battery needs a lower float. Without compensation the string is overcharged on hot days and undercharged on cold ones.
V_float = 24 · (2.25 − 0.003 · (T − 25))
Failure modes
What breaks, what it looks like, what the twin does about it.
| Failure mode | The physics | Signals that show it | How the twin catches it |
|---|---|---|---|
| Module failure | A module stops converting. The others pick up its share. | Module current falls to zero. The other modules’ currents step up. | Sees the sharing shift and checks there is still a spare module for N+1. |
| Fan failure and thermal derating | Without airflow the module heats and cuts its own output to protect itself. | Module temperature up. Its output down while the load is the same. | Compares each module’s temperature and output with its neighbours at the same load. |
| Uneven sharing | A module set slightly high carries more than its share, runs hotter and ages first. | One module’s current outside ±10% of the average. | Checks sharing every reading and names the module that drifts. |
| Wrong float setting | Float too high overcharges and dries the battery. Too low and it never gets full. | Float voltage off the temperature-compensated curve. Float current high or near zero. | Sets the float voltage against the compensation curve for today’s battery temperature. |
| Low-voltage disconnect set too high | The load is dropped while the battery still has charge left. | Radios drop early in an outage with battery capacity still in hand. | Checks the disconnect setting against 43.2 V and the autonomy the site should have. |
What the twin does not do
- The twin does not change rectifier settings itself. Efficiency mode and float changes go through your controller, with a person approving.
How we catch it early
A physics twin and a PINN, working on one rectifier system.
The twin is a set of equations for this machine, tuned to its nameplate. Give it the flow, speed and conditions and it returns what every reading should be. It always gives the same answer for the same inputs.
A physics-informed neural network, or PINN, sits on top. It is trained on the plant’s own data and it is penalized whenever it breaks a physics rule. So it can only learn what the equations leave out: wear, fouling, friction. It cannot invent an answer that the machine could never produce.
Step 1
Measure
Flow, pressure, current, temperature, vibration. Whatever the asset already has.
Step 2
Physics twin
The equations of this machine, set to its nameplate. It says what the readings should be right now.
Step 3
Residual
Measured minus expected. Demand, weather and speed are already taken out.
Step 4
PINN
A small neural network that learns the cause of the gap, under the physics rules.
Step 5
Finding
A named cause, a date, and the kWh or hours at stake. An engineer reviews it.
loss = (measured − predicted)² + λ · (physics residual)²
The second term is the rulebook. It is zero when the network obeys the equations.
Why this beats black-box AI
A black-box model learns patterns from history. It needs examples of each failure, and it goes quiet when the pump runs at a point it has not seen. The twin starts from physics, so it works on day one. The PINN adds what physics cannot know about this particular machine.
That is also what makes the savings countable. The baseline is a calculation, not a guess, so the gap between baseline and meter is a number a customer can check.
What the twin checks on this asset
- Efficiency against the curve at today’s load: 93.4% with all on
- Module sharing within ±10%
- Float voltage against the temperature-compensated set point
- N+1 kept after a module fails
| Fixed alarm | Black-box AI | Twin + PINN | |
|---|---|---|---|
| Needs failure history to learn | No | Yes, lots | No |
| Says what is wrong | No | Rarely | Yes, by name |
| Works at a flow it has never seen | No | Often fails | Yes, the equations still hold |
| Puts a number on the saving | No | No | Yes, in kWh and dollars |
| Lead time on slow wear | Late | Varies | Weeks to months |
| Every number can be traced | Yes | No | Yes, to an equation |
What the twin puts a number on
Energy and cost, from the equations.
Efficiency mode at 2.4 kW
57 W per site
170 W of losses with all 6 on, 113 W with 2 on
Energy per site
501 kWh a year
Running all year
Across 1,000 sites
501 MWh a year
Same load at every site
Less cooling to do
57 W of heat
19 W less air conditioner power at 35 °C outside
What we do for you
We watch it. We catch it. We prove it.
Our reliability engineers run the twin on your rectifier system, review every finding, and help your crew fix it. After the repair we compare the meter to the baseline and write the result in the ledger.
More assets
More from telecom towers, then the lead asset of each other industry.
- Telecom towersDiesel generator setOpen
- Telecom towersBattery bankOpen
- Telecom towersShelter coolingOpen
- Telecom towersFuel tankOpen
- Telecom towersTransfer switch and mainsOpen
- Water & wastewaterCentrifugal pumpOpen
- ManufacturingRotary screw air compressorOpen
- Buildings & data centersWater-cooled centrifugal chillerOpen
- Energy & utilitiesPower transformerOpen
- PharmaceuticalWFI distribution loopOpen
- Oil & gasReciprocating gas compressorOpen